School Heating System Recovery

School Heating System Recovery

Progressive Stabilisation Strategy Without Full Shutdown Background The school’s heating system was in extremely poor condition and required urgent assessment. The system serves multiple classrooms and areas via radiant panels. Due to: A high number of individual...
Multi-Occupancy Office Block – System Stabilisation Strategy

Multi-Occupancy Office Block – System Stabilisation Strategy

Progressive Filtration Without Full System Shutdown Background After a complex site survey, we identified that the communal heating system serving multiple flats was in extremely poor condition and required immediate protection. Due to: A high number of individual...
Commercial Office Cooling System Recovery

Commercial Office Cooling System Recovery

Fan Coil Unit Power Cleansing & Progressive Filtration Strategy Background A commercial building operating underfloor heating and fan coil units began experiencing significant cooling performance issues. The heating side of the system remained stable, however the...
Care Home – System Protection Upgrade

Care Home – System Protection Upgrade

Filter Installation Background A care home experienced recurring heating complaints and ongoing iron contamination affecting radiators and pumps. Shutdown windows were simply not feasible due to resident care requirements. The Challenge Limited disruption allowed...
CHP Plant – BESPOKE 2.5” Commercial Flush & Filter

CHP Plant – BESPOKE 2.5” Commercial Flush & Filter

CHP Powercleanse (bespoke system flush strategy and custom 2.5” SMIDDY fitted) Background On-site inspection identified internal fouling, sludge accumulation, and magnetite contamination within the heat exchanger and associated pipework. Elevated internal temperatures...